|Knowledge|emergencyEmergency Water & WASH|Sign InCreate Account
Home/Marketplace/Solutions/Configured SWRO Plant
precision_manufacturingTurnkey Configured Water Plant Solution

Containerized Seawater Desalination Plant (5,000 m³/day Turnkey Skid)

Engineered turnkey configured solution designed for Seawater Desalination. Standardizes delivery of high-purity product water while maximizing energy efficiency and operational reliability via pre-fabricated skids.

scheduleLead Time: ~14 Weeks DeliveryverifiedTurnkey Commissioning IncludedhubISO 9001 / ASME Standard
Quick Sizing Benchmark
Indicative Budget:$1.4M – $2.1M FOB
upload_fileUpload Existing Project BOQ

analyticsGuaranteed Operational Outcomes & Performance Limits

Capacity Range2,500 - 7,500 m³/day ModularModular scalability
Delivery Timeline~14 WeeksFactory dispatch
Process IntegrationPre-tested Plug & PlayStandardized skids
Target AssetCoastal Municipalities, Resorts, Offshore Ports & Industrial ComplexesCustomized baseline

view_moduleIncluded Modular Process Skids (5)

Fully skid-mounted and pre-piped in ISO containers
01

Dual Multimedia Pressure Filters

Factory integrated skid assembly (Stage 01) with instrumentation & PLC controls

checkFAT Tested in Factory
02

Dual SWRO Racks

Factory integrated skid assembly (Stage 02) with instrumentation & PLC controls

checkFAT Tested in Factory
03

PX Energy Recovery Turbine

Factory integrated skid assembly (Stage 03) with instrumentation & PLC controls

checkFAT Tested in Factory
04

Automated CIP Cleaning Station

Factory integrated skid assembly (Stage 04) with instrumentation & PLC controls

checkFAT Tested in Factory
05

Siemens S7-1500 PLC Telemetry Panel

Factory integrated skid assembly (Stage 05) with instrumentation & PLC controls

checkFAT Tested in Factory

constructionIncluded Turnkey Engineering & Commissioning Scope

check_circleCivil Foundation Engineering Review
check_circleFactory Acceptance Testing (FAT)
check_circleOn-Site Commissioning & Handover
check_circle1-Year 24/7 Remote Monitoring Telemetry

playlist_add_checkEngineering Design Assumptions

  • Customer supplies concrete foundation slab and raw feed water connection.
  • Customer supplies 400V / 3-phase / 50-60Hz electrical power boundary point.
  • Raw water conditions comply with specified design envelope TDS limits.

warningExplicit Battery Limit Exclusions

  • Off-site raw water intake civil structures and long-distance conveyance piping.
  • Local environmental permit filing fees (technical dossier supplied by HydroPonds).