Turnkey Surface Drinking Water Clarification Plant (25,000 m³/day)

Engineered turnkey configured solution designed for Drinking Water Purification. Standardizes delivery of high-purity product water while maximizing energy efficiency and operational reliability via pre-fabricated skids.

scheduleLead Time: ~20 Weeks DeliveryverifiedTurnkey Commissioning IncludedhubISO 9001 / ASME Standard
Quick Sizing Benchmark
Indicative Budget:$1.4M – $2.1M FOB
upload_fileUpload Existing Project BOQ

analyticsGuaranteed Operational Outcomes & Performance Limits

Capacity Range15,000 - 50,000 m³/day TurnkeyModular scalability
Delivery Timeline~20 WeeksFactory dispatch
Process IntegrationPre-tested Plug & PlayStandardized skids
Target AssetRegional Water Boards, River Intake Stations & City UtilitiesCustomized baseline

view_moduleIncluded Modular Process Skids (5)

Fully skid-mounted and pre-piped in ISO containers
01

Rapid Flash Mixing Chamber

Factory integrated skid assembly (Stage 01) with instrumentation & PLC controls

checkFAT Tested in Factory
02

Lamella Tube Settlers

Factory integrated skid assembly (Stage 02) with instrumentation & PLC controls

checkFAT Tested in Factory
03

Dual Media Pressure Filters

Factory integrated skid assembly (Stage 03) with instrumentation & PLC controls

checkFAT Tested in Factory
04

Chlorine Dioxide & UV Disinfection Stage

Factory integrated skid assembly (Stage 04) with instrumentation & PLC controls

checkFAT Tested in Factory
05

Sludge Thickening Sump

Factory integrated skid assembly (Stage 05) with instrumentation & PLC controls

checkFAT Tested in Factory

constructionIncluded Turnkey Engineering & Commissioning Scope

check_circleRaw Water Seasonal Jar Testing Analysis
check_circleCommissioning Protocol Execution
check_circleWHO Drinking Water Guidelines Compliance Audit

playlist_add_checkEngineering Design Assumptions

  • Customer supplies concrete foundation slab and raw feed water connection.
  • Customer supplies 400V / 3-phase / 50-60Hz electrical power boundary point.
  • Raw water conditions comply with specified design envelope TDS limits.

warningExplicit Battery Limit Exclusions

  • Off-site raw water intake civil structures and long-distance conveyance piping.
  • Local environmental permit filing fees (technical dossier supplied by HydroPonds).