precision_manufacturingTurnkey Configured Water Plant Solution
Containerized Seawater Desalination Plant (5,000 m³/day Turnkey Skid)
Engineered turnkey configured solution designed for Seawater Desalination. Standardizes delivery of high-purity product water while maximizing energy efficiency and operational reliability via pre-fabricated skids.
scheduleLead Time: ~14 Weeks DeliveryverifiedTurnkey Commissioning IncludedhubISO 9001 / ASME Standard
analyticsGuaranteed Operational Outcomes & Performance Limits
Capacity Range2,500 - 7,500 m³/day ModularModular scalability
Delivery Timeline~14 WeeksFactory dispatch
Process IntegrationPre-tested Plug & PlayStandardized skids
Target AssetCoastal Municipalities, Resorts, Offshore Ports & Industrial ComplexesCustomized baseline
view_moduleIncluded Modular Process Skids (5)
Fully skid-mounted and pre-piped in ISO containers01
Dual Multimedia Pressure Filters
Factory integrated skid assembly (Stage 01) with instrumentation & PLC controls
checkFAT Tested in Factory
02
Dual SWRO Racks
Factory integrated skid assembly (Stage 02) with instrumentation & PLC controls
checkFAT Tested in Factory
03
PX Energy Recovery Turbine
Factory integrated skid assembly (Stage 03) with instrumentation & PLC controls
checkFAT Tested in Factory
04
Automated CIP Cleaning Station
Factory integrated skid assembly (Stage 04) with instrumentation & PLC controls
checkFAT Tested in Factory
05
Siemens S7-1500 PLC Telemetry Panel
Factory integrated skid assembly (Stage 05) with instrumentation & PLC controls
checkFAT Tested in Factory
constructionIncluded Turnkey Engineering & Commissioning Scope
check_circleCivil Foundation Engineering Review
check_circleFactory Acceptance Testing (FAT)
check_circleOn-Site Commissioning & Handover
check_circle1-Year 24/7 Remote Monitoring Telemetry
playlist_add_checkEngineering Design Assumptions
- Customer supplies concrete foundation slab and raw feed water connection.
- Customer supplies 400V / 3-phase / 50-60Hz electrical power boundary point.
- Raw water conditions comply with specified design envelope TDS limits.
warningExplicit Battery Limit Exclusions
- Off-site raw water intake civil structures and long-distance conveyance piping.
- Local environmental permit filing fees (technical dossier supplied by HydroPonds).
